About us
Company Profile
Nawalpur Drilling andConstruction
- (NDC)Pvt. Ltd.
- Gaindakot-5, Patana Devi Marga
- Water Supply & Drilling Department
COMPANY PROFILE
Overview
About NDC
WATER SUPPLY & WELL DRILLING DEPARTMENT
Our Water Supply & Well Drilling Department performs services of water well construction and all associated works.
Well drilling construction services consist of following works. Geophysical study to obtain specific data of ground layers prior to drilling. Borehole drilling in several sizes. Well development (Placement of filter pack, casing, screening and pump testing) Well construction(Placement of pump, piping, surface grouting, well house) Preparation of geophysical study report and well construction logs.
DEPARTMENT STRUCTURE
Our Water Supply & Well Drilling Department has qualified engineers, drilling technicians and plumbers. Organization flow-chart of this department is as follows;
ABOUT NDC
Nawalpur Drilling and Construction Pvt. Ltd., a private organization of qualified experts in the fields of Well drilling, Construction, Sewerage systems, water supply and distribution systems and Electrical power supply systems.
COMPANY STRUCTURE
Nawalpur Drilling and Construction Pvt. Ltd. maintain its activities by two separately organized departments which are Construction Department and Water Supply & Drilling Department. Our company has qualified technical personnel for each department who are assigned to key positions. These two departments consist of architects, interior decorators, landscape architects, civil, mechanical, electrical, structural engineers, drilling technicians and ground water survey engineers.NDC also has employed personnel for public relations, marketing, accounting, quality, safety, and purchasing units.
ORGANIZATION POLICY
Nawalpur Drilling and Construction Pvt. Ltd. acts as bridge linking donors and the main population, and we are always impartial concerned only with where the projects can have a bigger social welfare and economic impact.
GOALS
Reconstruction and rehabilitation of Nepal Promoting constructional projects in Nepal Determining priorities in the fields it covers Providing modern facilities, equipment’s and materials Upgrade the level of rebuilding according to the level of the developed countries
OUR VISION
Our vision is to form new designs by the best aesthetic and functional solutions and to be the initiator of our sector without making any concessions in terms of quality and by meeting the expectations of our customers excessively.
OUR BUSINESS POLICY
Our business policy is to meet the expectations of our customers perfectly on time on each and every occasion; to supply them with the best service which is respectful to the natural environment, which will ensure the highest customer satisfaction in terms of aesthetics and function.
SERVICES
We are maintaining our services in the following fields. Construction of water supply, treatment, storage and distribution systems. Construction of sewer lines and waste water treatment systems. Electrical power supply and distribution systems.
Organizational Chart
- Suruchi Bhatta
- Hydrogeologist
Resources
OUR STAFF SELECTION POLICY
Nawalpur Drilling and Construction Pvt. Ltd selects the most suitable candidates based on our vision. Selection criterion includes not only technical competence, but also the ability to work within the framework of the project team. Our key personnel also must be able to communicate effectively in English as this is the primary language for many well drilling and construction projects in Nepal. All applicants are carefully screened via an interview by the appropriate department manager.
GROUNDWATER SUPPLY AND IRRGATION DEPARTMENT PERSONNEL
LIST
S.N. Assignment Qualification Employed Country Count
1 Management MBA(TU),MBS(TU) Nepal 3
2 Geologist MasterDegree in Nepal 2
Geology
(Hydrogeologist)
3 Site Engineer BE(Civil) Nepal 1
4 Mechanical Engineer BE(Mechanical) Nepal 2
5 Drilling Technician Nepal 4
6 Plumber Nepal 2
7 Skilled labor Nepal 50MACHINERY&EQUIPMENTLIST
MACHINE BRAND MODEL QUANTITY Drill Rig(Capable to drill 150m) Percussion Machine 2 Drill Rig(Capable to drill 300m) DTH300 1 Drill Rig (Capable to drill 100m) DTH 100 1
Drilling Pipes(6.0m) 100
Compressor(16bar) Inner sole Rand 20001 1 Compressor(20bar) Atlas Copco XRVS-4661 1 Compressor(8bar) Innersole Rand 19881 1 Electrical compressor(20bar) 20051 1
Generator(40kVa) 1
Water Tank(5m3) 2
Welding Machine 5
Well TV camera 2
Office/LSA Trailer 1
Water level indicator 1
Available Equipment and Resources
Testing Equipments
We work with:
Nepal Police
Nepal Army Nepal APF Development of National Park Wildlife Conversation Chitwan National Park Bardiya National Park Tcn Nepal Rastra Patichure Conservation program United States Agency International Development World wide fund for nature Red Cross Society
Some our other partners
Lord Himalayan Construction Company Pvt. Ltd
Gandaki National Engineering solution Pvt. Ltd Kalinchok Drilling and Construction Pvt. Ltd Sailung Construction and Deep Tube well Company Pvt. Ltd Extra Energy and Construction Pvt. Ltd Cristal Drilling Green Tech Engineering company
RECENTLY COMPLETED WATER SUPPLY PROJECTS
Client Name Location Work details Count Total
of Depth
wells
Masyngdi Gaupalika Bahun dada 8" / 6" Deep boring and 15Hp pump 1 132Mtr
supply and installation
Bardiya National Park 6" Deep Boring and installation solar 13 735Mtr
Thakurduwar Bardiya BNP Area pumping system different 13 site
Bhanu Ma. Bi. Narayangarh 6"deep Boring and 5Hp submersible 1 100Mtr
Pump fitting
Thori Gaupalika Madi Area 8"/6" Deep boring Construction and 6 660Mtr
10Hpsubmersiblepumpsupplyand
fitting
Water Resources and Nuwakot 8"/6" dia. Deep tubewell and pump test. 1 200Mtr
Irrigation Development Tupche pallotar and Antaretar lift irrigation,
division office Nuwakot Bazar bidur-07 Nuwakot
WRIDD-NKT/2077-78/NCB-06
Water Supply and Sanitation Makawanpur H 8"/6"DrillingandInstallationof Deep 1 150Mtr
Division no 1 uda Tubewell at Devghat Kalpabas WSP,
Bharatpur Chitwan
WSSD1/Makawanpur/10/2078/079
Nature conversion school Kasara chitwan 8"/6" Deep Boring and 7.5HpPump 1 100Mtr
installation
Deictic Police office Pokhara 6"Deep Boringand3Hppump Fitting 1 60Mtr
Ground Water Resource and Devchuli 10"/6" Deep Boring works 2 240Mtr
Irrigation office kaski 0 GWRIO/NCB/01-03/077-78
Pokhara 1 Nawalpur
Everest Connection Pokhara - 8"/6" Construction of Deep boring by 1 224Mtr
Investment Pvt. Ltd. 13 Arbha DTH Method and 7.5 Hp pump supply
and installation
Kudauli Shallow Tubewell Kawasoti-11 6" Shallow Tube well Construction by 10 420Mtr
Upabhokta Samiti DTH Methods and 3Hp submersible
Pump supply and Fitting
Teenghare satghare Tadi Kawasoti-16 6" Shallow Tube well Construction by 10 412Mtr
Shallow Tubewell Niraman DTH Method 3Hp submersible Pump
Jal Upabhokata samiti supply and FittingKujauli Shallow Tubwell Jal Debchuli-17 6" Shallow Tube well Construction by 5 218Mtr
Upabhokta Samiti DTH Method and 3Hp submersible
Pump supply and Fitting
Nandabhauju shallow Madhayabindu 6" Shallow Tubewell Construction by 10 398Mtr
Tubwell Jal Upabhokta -03 DTH Method and 3Hp submersible
Samiti Pump supply and
Fitting
Shree Shahid Smriti Kawasoti-03 8"/6"Deep Boring pump supply and 1 110Mtr
Community Secondary Fitting
School
Janakalian Secondary School Madhyabindu 6"Deep Boring Constriction 5Hp 1 84Mtr
Chormara submersible pump supply and Fitting
Bharatpur water supply Bharatpur 12"/8"Drilling and Installation Deep 1 92Mtr
Management Board Tube- Well
BWSMB/WORKS/078/079/02
GPKoirala National Center Dulgauda 8"/6"DeepBoringConstruction,7.5 1 120Mtr
For Respiratory Disease Tanahu Hp submersible pump supply and Fitting
Water Supply and Sanitation Gulmi Drillingof8"/6"dia.Deeptubewell 1 154Mtr
Division office (WSSDO/Gulmi/SQ/W/078-79/12
Water Supply and Sanitation Gulmi Drillingof8"/6"dia.Deeptubewell 1 150Mtr
Division office (WSSDO/Gulmi/SQ/W/078-79/13
Shree mahabir Gan (Ranger) Airport 8" Deep Boring Reservoir Tank and 1 150Mtr
Pokahara water tank Stand with supply
NA/MGR/T/078/079/01
Federal water supply and Rapti, 10"/8"ConstructionofdeepTube well 5 488Mtr
sewage management Project Bharatpur work
02/FWSSMPchitwan/078-79,
03/FWSSMPchitwan/078-79,
01/FWSSMPchitwan/078-79,
25/FWSSMPchitwan/078-79,
24/FWSSMPchitwan/078-79,
Groundwater Resources Babarmahal 03/DTW/Kanchanpur/SQ/79/80 2 186Mtr
Development Board 02/DTW/Tanahu/SQ/79/80Bheribabai Diversion Birendranagar BBDMP/NCB-11/DTH/078-79 44 2447 Mtr
Multipurpose Project BBDMP/NCB-11/DTH/078-79
8"DeepBoringWorks
Kalibhanjyang Gan (E) Damauli 8"DeepBoringWorks 1 100Mtr
chapaghat Barak
Digoshallow Tubewell Jal Kawasoti07 6"ShallowTubewell Construction by 5 218Mtr
Upabhokta Samiti DTH Method and 3Hp submersible
Pump supply and Fitting
Shree Chirouli Shallow Madi-02 6"ShallowTubewell Construction by 7 306Mtr
Tubewell DTH Method
Sidartha bhumigat Jal Bharatpur-23 6"ShallowTubewell Construction by 4 150Mtr
Sinchai Shallow Tubewell DTH Method
Upabhokta Samiti
Shree Swosthani Power Bharatpur14 6"ShallowTubewell Construction by 5 235Mtr
Drilling Tatha Shallow DTH Method
tubewell
Unnat Krishak Samuha Bharatpur-28 6"ShallowTubewell Construction by 10 384Mtr
DTH Method
Bharatpur Metropolitan City Bharatpur- 10, 10”/8"Deep Tubewell Construction of 1 89mtr
Office of the Municipal Chitwan Deep Tubewell at Bharatpur Hospital
Executive BMC-10
SUNATADI KRISHAK Dumkibas, Binai, DRILLING AND CONSTUCTION OF 1 108mtr
SAMUHA DUMKIBAS Tribeni-2 250mm/200mm Dia., DEEP
TUBEWELL
By DTH Method
Federal water supply and Gaidakot Drilling And Installing 250mm/200mm 1 104mtr
sewage management Project Municipality-07, Dia. Deep Tubewell By Rig Machine
Nawalparasi Using Direct Rotary Method Of
Constuction Of Deep Tubewell,
Development And Pumping Test
Integrated Energy and Manthali, Construction Of 200 Mm (8”) Dia. 6 300Mtr
Irrigation Special Program Ramechhap Investigation Tubewell Along
Pulchowk, Lalitpur Tamakoshi River Corridor
Integrated Energy and Kaligandaki Construction of 200 mm (8”) dia. 19 982Mtr
Irrigation Special Program Corridor Investigation Tubewell, along the
Pulchowk, Lalitpur Kaligandaki River Corridor
Devachuli Municipality Devachuli-17, Construction of 200 mm (8”) dia. Deep 1 84Mtr
Nawalparasi (Bardaghat Nawalpur TubewellSusta Purba)Gandaki
Province, Nepal
Bheri Babai Diversion Various locations Construction of Tube well by DTH 21 1106Mtr
Multipurpose Project of method in various locations of
Bheriganga Bheriganga Municipality, Surkhet and
Municipality, Chepang, Bansgadhi Municipality-1,
Surkhet and Bardiya
Chepang, BBDMP/Social/NCB-10/DTH/078-79
Bansgadhi
Municipality-1,
BardiyaSome Project Reference with images. Drilling of Well Location:Arbha Pokhara Date: 2012 Contractor: NDC Depth: 220m8"/6"
Drilling of Well
Location: Different site in Kawasoti Date: 2021 Contractor: NDC Depth: 48m /6"
Drilling of Well
Location: Debchuli 17 Jhare khola Date: 2021 Contractor: NDC Depth: 110m 10"/6"
Drilling of Well
Location: Touché Nuwakot Date: 2021 Contractor: NDC Depth: 200m 8"/6"
- Well Development Methodology
WELL DRILLING METHODOLOGY
Water well construction mainly consists two phases which are primary geophysical study and well construction process.
SITE GEOPHYSICAL STUDY
Prior to start any drilling operation, a geophysical study of project site must be performed in order to obtain ground layer specifications. The purpose of this geophysical study is to; Determine surface and sub-surface geophysical structures. Determine layer thicknesses. Determine horizontal and vertical extension of the layers. Determine layer humidity depth of groundwater. Prepare geophysical report.
WELL CONSTRUCTION PROCESSES
Bore hole drilling Well construction(includes placement of casing, screening) Well development (pumping Air into the well to increase yield of well by cleaning screens
- and aquifers and removing debris that introduced during construction of the well)
Pump testing to identify well yield Well completion(includes surface grouting, placement of permanent pump and pipes, well
- house)
Preparation of geophysical study reports and well construction logs
GEOPHYSICAL STUDY
Geophysical prospecting helps to determine well location, depth and diameter. Schlumberger vertical electrical sounding array is the best technical for investigation of underground water.
Schlumberger Array Technique
Current and Voltage electrodes are lined up in the same direction. Voltage electrodes are placed inside and Current electrodes are placed outside. “b” refers to distance between two voltage electrodes and “a” refers to distance of each Current electrodes to center of the system. Impedance is calculated via the equation stated above. The results of vertical electrical sounding (VES) enable us to; Determine surface and sub-surface geophysical structure. Determine layer thickness. Determine horizontal and vertical extension of the layer. Determine humidity of the layer. Determine depth of groundwater. Prepare geophysical report.
WELL DRILLING
NDC uses the biggest drilling machine (capable to drillupto500meters) in Nepal for deep well drilling. The DTH drilling method enables us to increase drilling speeds to reach greater depths in most formations. The borehole is drilled by a rotating bit and the waste material is removed by the special mud circulation system that also penetrates the formation to maintain the well wall non per mobility. The drilling bit is attached to the lower end of the string of the drill pipe, which transmits the rotating action from the rig to the bit. In the rotary system, drilling mud is pumped down through the drill pipe and out through the ports or jets in the bit; carrying the waste material in suspension to the surface. At the surface, the mud is channeled into a setting pit or pits where most of the waste material is sieved. The sieved clean mud is sucked up by the pump at the far end of pit or from these cond. pit and re-circulated into the system. The components of the rotary drilling machines are designed to serve two functions simultaneously; operation of the bit and continuous circulation of the drilling mud. Both are indispensable in cutting in maintaining the borehole.
Well Casing
Well casing serves as a lining to maintain an open hole from ground surface to the aquifer. To restrain extension water penetration to the well, it also provides structural support against caving materials outside of the well. Materials that will be used for well casing are PVC pipes that are specially designed for depth of wells and Black steel ASTM A53 Standard casing which can be
installed in the wells. Joints normally consist of threaded couplings and weld which secure water tightness. Surface casing is installed from ground surface through upper strata of unstable or fractured materials into a stable end, if possible, relatively impermeable material. Such surface casing serves several purposes. Including: supporting unstable materials during drilling, reduce the loss of drilling mud, facilitating installation or removal of other casing, aiding in placing a sanitary seal, serving as servoir for gravel pack. The casing may be temporary during drilling or it may be permanent.
Cementing
The term cementing includes the entire operation of mixing and injecting the grout. Grouting well casing involves filling the drilled hole with a suitable slurry of cement and water,is commonly used but paddled clay can also be used, if used at depth where drying and shrinkage of mud will not occur and where water movement will not wash away the clay particles. If the well construction includes both inner and outer casing, grout is placed between and outside the two casing.
Well screens
Well screens serve in two basic functions. First they support the sides of the hole in unconsolidated or fractured grout thereby preventing collapse. Second keeps sediment out of the well while still offering the largest practical open area in the aquifer to minimize resistance to flow, the materials can be PVC or Stainless steel 304.
WELL DEVELOPMENT
Well development defined as treatment of a well by mechanical, chemical or other means for the purpose of removing an underground resistance flow. The term well development is sometime called groundwater or aquifer development it is the general process of drilling a well to make an aquifer available for water supply. Development usually takes places as soon as the drilling of the well is complete and borehole is put into supply, the general objective is to repair any damage the aquifer caused by the drilling process to obtains maximum production efficiency.
Gravel Pack Materials
Permits use of large screen slot with a maximum open area provides an annular zone of high permeability, which increases the effective radius and yield of the well. NDC will use the size of gravel pack materials that are compliant with standards.
PUMP TESTING
NDC performs pump testing prior to completion of well to identify the well yield and recovery. The common reasons for pump testing are;
- To determine the hydraulic characteristics of the aquifer and the regional pattern of the groundwater flow.
- To investigate the effects of the design abstraction rate on the water level in the aquifer and on rivers and environment in general.
- To determine the aquifer loss, well loss and efficiency of the well.
- To determine the perennial yield of the well.
- To determine the future operational setup of the well.
PREPARATION OF REPORTS AND LOGS
NDC prepares geophysical study reports and well construction logs following completion of well construction works. These reports and logs help our clients to a better understanding of the ground specifications and aquifer locations. Not only the aquifer locations but also the key parameters such as well depth, screen locations, pump location, well yield and pump testing results included in these well construction logs.
Nawalpur Drilling and Construction (NDC) Pvt. Ltd.
- (Boring Company)
- Gaindakot-05 Patanadevi
- Marga PH. No:-078-502133
- e-mail: [email protected]

