Water supply and drilling site of NDC

About us

Company Profile

Nawalpur Drilling andConstruction

  • (NDC)Pvt. Ltd.
  • Gaindakot-5, Patana Devi Marga
  • Water Supply & Drilling Department

COMPANY PROFILE

Overview

About NDC

WATER SUPPLY & WELL DRILLING DEPARTMENT

Our Water Supply & Well Drilling Department performs services of water well construction and all associated works.

Well drilling construction services consist of following works.  Geophysical study to obtain specific data of ground layers prior to drilling.  Borehole drilling in several sizes.  Well development (Placement of filter pack, casing, screening and pump testing)  Well construction(Placement of pump, piping, surface grouting, well house)  Preparation of geophysical study report and well construction logs.

DEPARTMENT STRUCTURE

Our Water Supply & Well Drilling Department has qualified engineers, drilling technicians and plumbers. Organization flow-chart of this department is as follows;

ABOUT NDC

Nawalpur Drilling and Construction Pvt. Ltd., a private organization of qualified experts in the fields of Well drilling, Construction, Sewerage systems, water supply and distribution systems and Electrical power supply systems.

COMPANY STRUCTURE

Nawalpur Drilling and Construction Pvt. Ltd. maintain its activities by two separately organized departments which are Construction Department and Water Supply & Drilling Department. Our company has qualified technical personnel for each department who are assigned to key positions. These two departments consist of architects, interior decorators, landscape architects, civil, mechanical, electrical, structural engineers, drilling technicians and ground water survey engineers.NDC also has employed personnel for public relations, marketing, accounting, quality, safety, and purchasing units.

ORGANIZATION POLICY

Nawalpur Drilling and Construction Pvt. Ltd. acts as bridge linking donors and the main population, and we are always impartial concerned only with where the projects can have a bigger social welfare and economic impact.

GOALS

Reconstruction and rehabilitation of Nepal  Promoting constructional projects in Nepal  Determining priorities in the fields it covers  Providing modern facilities, equipment’s and materials  Upgrade the level of rebuilding according to the level of the developed countries

OUR VISION

Our vision is to form new designs by the best aesthetic and functional solutions and to be the initiator of our sector without making any concessions in terms of quality and by meeting the expectations of our customers excessively.

OUR BUSINESS POLICY

Our business policy is to meet the expectations of our customers perfectly on time on each and every occasion; to supply them with the best service which is respectful to the natural environment, which will ensure the highest customer satisfaction in terms of aesthetics and function.

SERVICES

We are maintaining our services in the following fields.  Construction of water supply, treatment, storage and distribution systems.  Construction of sewer lines and waste water treatment systems.  Electrical power supply and distribution systems.

Organizational Chart

  • Suruchi Bhatta
  • Hydrogeologist

Resources

OUR STAFF SELECTION POLICY

Nawalpur Drilling and Construction Pvt. Ltd selects the most suitable candidates based on our vision. Selection criterion includes not only technical competence, but also the ability to work within the framework of the project team. Our key personnel also must be able to communicate effectively in English as this is the primary language for many well drilling and construction projects in Nepal. All applicants are carefully screened via an interview by the appropriate department manager.

GROUNDWATER SUPPLY AND IRRGATION DEPARTMENT PERSONNEL

LIST

  S.N. Assignment              Qualification            Employed Country          Count

  1     Management             MBA(TU),MBS(TU)          Nepal                     3

  2     Geologist              MasterDegree in          Nepal                     2
                               Geology
                               (Hydrogeologist)
  3     Site Engineer          BE(Civil)                Nepal                     1

  4     Mechanical Engineer    BE(Mechanical)           Nepal                     2

  5     Drilling Technician                             Nepal                     4

  6     Plumber                                         Nepal                     2

  7     Skilled labor                                   Nepal                     50

MACHINERY&EQUIPMENTLIST

 MACHINE                             BRAND             MODEL                QUANTITY

 Drill Rig(Capable to drill 150m)                      Percussion Machine   2

 Drill Rig(Capable to drill 300m)                      DTH300               1

 Drill Rig (Capable to drill 100m)                     DTH 100              1

Drilling Pipes(6.0m) 100

 Compressor(16bar)                   Inner sole Rand   20001                1

 Compressor(20bar)                   Atlas Copco       XRVS-4661            1

 Compressor(8bar)                    Innersole Rand    19881                1

 Electrical compressor(20bar)                          20051                1

Generator(40kVa) 1

Water Tank(5m3) 2

Welding Machine 5

Well TV camera 2

Office/LSA Trailer 1

Water level indicator 1

Available Equipment and Resources

Testing Equipments

We work with:

 Nepal Police

 Nepal Army  Nepal APF  Development of National Park Wildlife Conversation  Chitwan National Park  Bardiya National Park  Tcn Nepal  Rastra Patichure Conservation program  United States Agency International Development  World wide fund for nature  Red Cross Society

Some our other partners

 Lord Himalayan Construction Company Pvt. Ltd

 Gandaki National Engineering solution Pvt. Ltd  Kalinchok Drilling and Construction Pvt. Ltd  Sailung Construction and Deep Tube well Company Pvt. Ltd  Extra Energy and Construction Pvt. Ltd  Cristal Drilling  Green Tech Engineering company

RECENTLY COMPLETED WATER SUPPLY PROJECTS

Client Name                       Location              Work details                              Count   Total
                                                                                                  of      Depth
                                                                                                  wells
Masyngdi Gaupalika                Bahun dada            8" / 6" Deep boring and 15Hp pump         1       132Mtr
                                                        supply and installation
Bardiya         National   Park                         6" Deep Boring and installation solar     13      735Mtr
Thakurduwar Bardiya               BNP Area              pumping system different 13 site

Bhanu Ma. Bi.                     Narayangarh           6"deep Boring and 5Hp submersible         1       100Mtr
                                                        Pump fitting
Thori Gaupalika                   Madi Area             8"/6" Deep boring Construction and        6       660Mtr
                                                        10Hpsubmersiblepumpsupplyand
                                                        fitting
Water Resources and               Nuwakot               8"/6" dia. Deep tubewell and pump test.   1       200Mtr
Irrigation Development            Tupche                pallotar and Antaretar lift irrigation,
division office Nuwakot Bazar                           bidur-07 Nuwakot
                                                        WRIDD-NKT/2077-78/NCB-06
Water Supply and Sanitation       Makawanpur H          8"/6"DrillingandInstallationof Deep       1       150Mtr
Division no 1                     uda                   Tubewell at Devghat Kalpabas WSP,
                                                        Bharatpur Chitwan
                                                        WSSD1/Makawanpur/10/2078/079
Nature conversion school          Kasara chitwan        8"/6" Deep Boring and 7.5HpPump           1       100Mtr
                                                        installation
Deictic Police office             Pokhara               6"Deep Boringand3Hppump Fitting           1       60Mtr

Ground Water Resource and         Devchuli              10"/6" Deep Boring works                  2       240Mtr
Irrigation office kaski                             0   GWRIO/NCB/01-03/077-78
Pokhara                           1 Nawalpur
Everest Connection                Pokhara       -       8"/6" Construction of Deep boring by      1       224Mtr
Investment Pvt. Ltd.              13 Arbha              DTH Method and 7.5 Hp pump supply
                                                        and installation
Kudauli Shallow Tubewell          Kawasoti-11           6" Shallow Tube well Construction by      10      420Mtr
Upabhokta Samiti                                        DTH Methods and 3Hp submersible
                                                        Pump supply and Fitting


Teenghare satghare Tadi           Kawasoti-16           6" Shallow Tube well Construction by      10      412Mtr
Shallow Tubewell Niraman                                DTH Method 3Hp submersible Pump
Jal Upabhokata samiti                                   supply and Fitting
Kujauli Shallow Tubwell Jal   Debchuli-17    6" Shallow Tube well Construction by     5    218Mtr
Upabhokta Samiti                             DTH Method and 3Hp submersible
                                             Pump supply and Fitting

Nandabhauju shallow           Madhayabindu   6" Shallow Tubewell Construction by      10   398Mtr
Tubwell Jal Upabhokta         -03            DTH Method and 3Hp submersible
Samiti                                       Pump supply and
                                             Fitting
Shree Shahid Smriti           Kawasoti-03    8"/6"Deep Boring pump supply and         1    110Mtr
Community Secondary                          Fitting
School
Janakalian Secondary School   Madhyabindu    6"Deep Boring Constriction 5Hp           1    84Mtr
                              Chormara       submersible pump supply and Fitting

Bharatpur water supply        Bharatpur      12"/8"Drilling and Installation Deep     1    92Mtr
Management Board                             Tube
  • Well

BWSMB/WORKS/078/079/02

GPKoirala National Center     Dulgauda       8"/6"DeepBoringConstruction,7.5          1    120Mtr
For Respiratory Disease       Tanahu         Hp submersible pump supply and Fitting

Water Supply and Sanitation   Gulmi          Drillingof8"/6"dia.Deeptubewell          1    154Mtr
Division office                              (WSSDO/Gulmi/SQ/W/078-79/12
Water Supply and Sanitation   Gulmi          Drillingof8"/6"dia.Deeptubewell          1    150Mtr
Division office                              (WSSDO/Gulmi/SQ/W/078-79/13
Shree mahabir Gan (Ranger)    Airport        8" Deep Boring Reservoir Tank and        1    150Mtr
                              Pokahara       water tank Stand with supply
                                             NA/MGR/T/078/079/01
Federal water supply and      Rapti,         10"/8"ConstructionofdeepTube well        5    488Mtr
sewage management Project     Bharatpur      work
                                             02/FWSSMPchitwan/078-79,
                                             03/FWSSMPchitwan/078-79,
                                             01/FWSSMPchitwan/078-79,
                                             25/FWSSMPchitwan/078-79,
                                             24/FWSSMPchitwan/078-79,
Groundwater Resources         Babarmahal     03/DTW/Kanchanpur/SQ/79/80               2    186Mtr
Development Board                            02/DTW/Tanahu/SQ/79/80
Bheribabai Diversion          Birendranagar      BBDMP/NCB-11/DTH/078-79                 44   2447 Mtr
Multipurpose Project                             BBDMP/NCB-11/DTH/078-79
                                                 8"DeepBoringWorks
Kalibhanjyang Gan (E)         Damauli            8"DeepBoringWorks                       1    100Mtr
chapaghat Barak
Digoshallow Tubewell Jal      Kawasoti07         6"ShallowTubewell Construction by       5    218Mtr
Upabhokta Samiti                                 DTH Method and 3Hp submersible
                                                 Pump supply and Fitting

Shree Chirouli Shallow        Madi-02            6"ShallowTubewell Construction by       7    306Mtr
Tubewell                                         DTH Method
Sidartha bhumigat Jal         Bharatpur-23       6"ShallowTubewell Construction by       4    150Mtr
Sinchai Shallow Tubewell                         DTH Method
Upabhokta Samiti
Shree Swosthani Power         Bharatpur14        6"ShallowTubewell Construction by       5    235Mtr
Drilling Tatha Shallow                           DTH Method
tubewell
Unnat Krishak Samuha          Bharatpur-28       6"ShallowTubewell Construction by       10   384Mtr
                                                 DTH Method
Bharatpur Metropolitan City Bharatpur- 10,       10”/8"Deep Tubewell Construction of     1    89mtr
Office of the Municipal       Chitwan            Deep Tubewell at Bharatpur Hospital
Executive                                        BMC-10
SUNATADI KRISHAK              Dumkibas, Binai,   DRILLING AND CONSTUCTION OF             1    108mtr
SAMUHA DUMKIBAS               Tribeni-2          250mm/200mm Dia., DEEP
                                                 TUBEWELL
                                                 By DTH Method
Federal water supply and      Gaidakot           Drilling And Installing 250mm/200mm     1    104mtr
sewage management Project     Municipality-07,   Dia. Deep Tubewell By Rig Machine
                              Nawalparasi        Using Direct Rotary Method Of
                                                 Constuction Of Deep Tubewell,
                                                 Development And Pumping Test
Integrated Energy and         Manthali,          Construction Of 200 Mm (8”) Dia.        6    300Mtr
Irrigation Special Program    Ramechhap          Investigation Tubewell Along
Pulchowk, Lalitpur                               Tamakoshi River Corridor
Integrated Energy and        Kaligandaki         Construction of 200 mm (8”) dia.        19   982Mtr
Irrigation Special Program   Corridor            Investigation Tubewell, along the
Pulchowk, Lalitpur                               Kaligandaki River Corridor
Devachuli Municipality        Devachuli-17,      Construction of 200 mm (8”) dia. Deep   1    84Mtr
Nawalparasi (Bardaghat        Nawalpur           Tubewell

Susta Purba)Gandaki

Province, Nepal

Bheri Babai Diversion    Various locations Construction of Tube well by DTH       21   1106Mtr
Multipurpose Project     of                method in various locations of
                         Bheriganga        Bheriganga Municipality, Surkhet and
                         Municipality,     Chepang, Bansgadhi Municipality-1,
                         Surkhet and       Bardiya
                         Chepang,          BBDMP/Social/NCB-10/DTH/078-79
                         Bansgadhi
                         Municipality-1,
                        Bardiya

Some Project Reference with images. Drilling of Well Location:Arbha Pokhara Date: 2012 Contractor: NDC Depth: 220m8"/6"

Drilling of Well

Location: Different site in Kawasoti Date: 2021 Contractor: NDC Depth: 48m /6"

Drilling of Well

Location: Debchuli 17 Jhare khola Date: 2021 Contractor: NDC Depth: 110m 10"/6"

Drilling of Well

Location: Touché Nuwakot Date: 2021 Contractor: NDC Depth: 200m 8"/6"

  • Well Development Methodology

WELL DRILLING METHODOLOGY

Water well construction mainly consists two phases which are primary geophysical study and well construction process.

SITE GEOPHYSICAL STUDY

Prior to start any drilling operation, a geophysical study of project site must be performed in order to obtain ground layer specifications. The purpose of this geophysical study is to;  Determine surface and sub-surface geophysical structures.  Determine layer thicknesses.  Determine horizontal and vertical extension of the layers.  Determine layer humidity depth of groundwater.  Prepare geophysical report.

WELL CONSTRUCTION PROCESSES

 Bore hole drilling  Well construction(includes placement of casing, screening)  Well development (pumping Air into the well to increase yield of well by cleaning screens

  • and aquifers and removing debris that introduced during construction of the well)

 Pump testing to identify well yield  Well completion(includes surface grouting, placement of permanent pump and pipes, well

  • house)

 Preparation of geophysical study reports and well construction logs

GEOPHYSICAL STUDY

Geophysical prospecting helps to determine well location, depth and diameter. Schlumberger vertical electrical sounding array is the best technical for investigation of underground water.

Schlumberger Array Technique

Current and Voltage electrodes are lined up in the same direction. Voltage electrodes are placed inside and Current electrodes are placed outside. “b” refers to distance between two voltage electrodes and “a” refers to distance of each Current electrodes to center of the system. Impedance is calculated via the equation stated above. The results of vertical electrical sounding (VES) enable us to;  Determine surface and sub-surface geophysical structure.  Determine layer thickness.  Determine horizontal and vertical extension of the layer.  Determine humidity of the layer.  Determine depth of groundwater.  Prepare geophysical report.

WELL DRILLING

NDC uses the biggest drilling machine (capable to drillupto500meters) in Nepal for deep well drilling. The DTH drilling method enables us to increase drilling speeds to reach greater depths in most formations. The borehole is drilled by a rotating bit and the waste material is removed by the special mud circulation system that also penetrates the formation to maintain the well wall non per mobility. The drilling bit is attached to the lower end of the string of the drill pipe, which transmits the rotating action from the rig to the bit. In the rotary system, drilling mud is pumped down through the drill pipe and out through the ports or jets in the bit; carrying the waste material in suspension to the surface. At the surface, the mud is channeled into a setting pit or pits where most of the waste material is sieved. The sieved clean mud is sucked up by the pump at the far end of pit or from these cond. pit and re-circulated into the system. The components of the rotary drilling machines are designed to serve two functions simultaneously; operation of the bit and continuous circulation of the drilling mud. Both are indispensable in cutting in maintaining the borehole.

Well Casing

Well casing serves as a lining to maintain an open hole from ground surface to the aquifer. To restrain extension water penetration to the well, it also provides structural support against caving materials outside of the well. Materials that will be used for well casing are PVC pipes that are specially designed for depth of wells and Black steel ASTM A53 Standard casing which can be

installed in the wells. Joints normally consist of threaded couplings and weld which secure water tightness. Surface casing is installed from ground surface through upper strata of unstable or fractured materials into a stable end, if possible, relatively impermeable material. Such surface casing serves several purposes. Including: supporting unstable materials during drilling, reduce the loss of drilling mud, facilitating installation or removal of other casing, aiding in placing a sanitary seal, serving as servoir for gravel pack. The casing may be temporary during drilling or it may be permanent.

Cementing

The term cementing includes the entire operation of mixing and injecting the grout. Grouting well casing involves filling the drilled hole with a suitable slurry of cement and water,is commonly used but paddled clay can also be used, if used at depth where drying and shrinkage of mud will not occur and where water movement will not wash away the clay particles. If the well construction includes both inner and outer casing, grout is placed between and outside the two casing.

Well screens

Well screens serve in two basic functions. First they support the sides of the hole in unconsolidated or fractured grout thereby preventing collapse. Second keeps sediment out of the well while still offering the largest practical open area in the aquifer to minimize resistance to flow, the materials can be PVC or Stainless steel 304.

WELL DEVELOPMENT

Well development defined as treatment of a well by mechanical, chemical or other means for the purpose of removing an underground resistance flow. The term well development is sometime called groundwater or aquifer development it is the general process of drilling a well to make an aquifer available for water supply. Development usually takes places as soon as the drilling of the well is complete and borehole is put into supply, the general objective is to repair any damage the aquifer caused by the drilling process to obtains maximum production efficiency.

Gravel Pack Materials

Permits use of large screen slot with a maximum open area provides an annular zone of high permeability, which increases the effective radius and yield of the well. NDC will use the size of gravel pack materials that are compliant with standards.

PUMP TESTING

NDC performs pump testing prior to completion of well to identify the well yield and recovery. The common reasons for pump testing are;

  •  To determine the hydraulic characteristics of the aquifer and the regional pattern of the groundwater flow.
  •  To investigate the effects of the design abstraction rate on the water level in the aquifer and on rivers and environment in general.
  •  To determine the aquifer loss, well loss and efficiency of the well.
  •  To determine the perennial yield of the well.
  •  To determine the future operational setup of the well.

PREPARATION OF REPORTS AND LOGS

NDC prepares geophysical study reports and well construction logs following completion of well construction works. These reports and logs help our clients to a better understanding of the ground specifications and aquifer locations. Not only the aquifer locations but also the key parameters such as well depth, screen locations, pump location, well yield and pump testing results included in these well construction logs.

Nawalpur Drilling and Construction (NDC) Pvt. Ltd.